News
Follow company dynamics and understand industry news
Your location:
Homepage
>
>
>
Propane full tank spray cooling device-Dürr equipment

Propane full tank spray cooling device-Dürr equipment

(Summary description)The propane storage tank is equipped with a spray cooling fire-fighting device, which is composed of pipelines, nozzles and water supply risers. It is installed on the tank roof, tank wall, stairs, safety passages and important process instruments and equipment, and the system installation complies with relevant domestic regulations.

Propane full tank spray cooling device-Dürr equipment

(Summary description)The propane storage tank is equipped with a spray cooling fire-fighting device, which is composed of pipelines, nozzles and water supply risers. It is installed on the tank roof, tank wall, stairs, safety passages and important process instruments and equipment, and the system installation complies with relevant domestic regulations.

Information

  The propane storage tank is equipped with a spray cooling fire-fighting device, which is composed of pipelines, nozzles and water supply risers. It is installed on the tank roof, tank wall, stairs, safety passages and important process instruments and equipment, and the system installation complies with relevant domestic regulations.

  The fire-fighting sprinkler pipeline of the storage tank is made of 20# seamless double-sided galvanized steel pipe, and the device adopts the overall anti-corrosion method. The device is prefabricated and welded and then integrally pickled and hot-dip galvanized inside and outside.

  The arrangement of the nozzles is arranged so that the fan-shaped water curtain sprayed by it has a certain intersection on the tank wall to prevent blind spots;

  There is a pressure reducing facility at the main entrance of the sprinkler device to control the inlet pressure. The outlet pressure and outflow coefficient of the sprinkler and the piping conditions meet the requirement that the actual spray volume after installation cannot exceed 5% of the calculated water volume; the spray intensity is as per The top of the tank is not less than 4L/min.㎡, and the wall of the tank is not less than 2.5L/min.㎡.

Scan the QR code to read on your phone

Latest Recommended

Analysis of LNG storage tanks!

Analysis of LNG storage tanks!

Nanyang Duer Gas Equipment Co., Ltd. is a joint-stock high-tech enterprise. The company is mainly engaged in the research and development, design, manufacture and after-sales service of various industrial gas equipment and cryogenic equipment. The company's products mainly include LNG cryogenic storage tanks, LNG storage tanks, water bath vaporizers, LNG full-capacity tanks, LNG vaporization stations, LNG liquid vacuum storage tanks, LNG storage tanks, large atmospheric LNG storage tanks, large LNG storage tanks, vacuum cryogenic storage Tanks, LNG storage tanks, large cryogenic tanks, natural gas vacuum storage tanks, cryogenic storage tanks, etc.
What are the special points in the design of large LNG storage tanks?

What are the special points in the design of large LNG storage tanks?

Generally, LNG is stored at -162 degrees. In order to ensure large-scale LNG storage tanks, the following factors need to be considered when selecting the metal materials for manufacturing cryogenic storage tanks: the strength within the range of normal temperature to -196 degrees, and sufficient in the use temperature range Toughness and plasticity, so as not to cause brittle failure. Stable metallographic structure, good processability and weldability, low price, easy to buy.
Public announcement of basic information of Nanyang Dur Gas Equipment Co., Ltd.

Public announcement of basic information of Nanyang Dur Gas Equipment Co., Ltd.

On May 26, 2021, Nanyang Municipal Bureau of Ecology and Environment issued the “Notice on Announcement of the List of Key Enterprises in Nanyang’s Compulsory Cleaner Production Audit for 2021” Wanhuan Office [2021] No. 20, Nanyang Duer Gas Equipment Co., Ltd. was It is included in this batch of mandatory cleaner production audit list, according to the "Clean Production Audit Measures"
Process analysis of LNG vaporization station!

Process analysis of LNG vaporization station!

Process flow of LNG vaporization station. The LNG transported by the tanker is turned on at the unloading platform of the gasification station to pressurize the tanker with its own booster. The pressure difference between the LNG tanker and the storage tank in the station is formed, which plays a role in the pressure difference. Next, the LNG is fed into the low-temperature storage tank of the gasification station for storage through the unloading hose. The low-temperature storage tank in the station makes the pressure of the storage tank reach the value through the storage tank booster, and the LNG in the tank enters the LNG vaporizer through the liquid outlet pipe.
Previous page
1
2
12
南阳杜尔气体装备有限公司

Nanyang Duer Gas Equipment Co., Ltd. is a joint-stock high-tech enterprise. The company is located in the picturesque north of the Han River and south of Funiu; the source of the South-to-North Water Diversion-Nanyang, the land of......

Contact us

Address:

South Section of Jingyi Road, Industrial Cluster District, Sheqi County, Nanyang City, Henan Province

Phone:

189-3780-9909

Mail:

nyduer@163.com

Quick Links

Follow us

南阳杜尔气体装备有限公司

Copyright ©2020 Nanyang Doer Gaseous Equipment Co., Ltd     豫ICP备15028160号-53     Powered by: www.300.cn  luoyang