Operating Procedures and Precautions for Oxygen, Nitrogen, and Argon Storage Tanks
Release time:
2022-06-28
The oxygen, nitrogen, and argon storage tank consists of a vacuum shell and a pressure vessel placed inside. It can operate under low to medium pressure according to actual design requirements.Oxygen, Nitrogen, and Argon Storage TankThe tank is equipped with a safety rupture device, which ensures safe protection in case of equipment overpressure. The oxygen, nitrogen, and argon storage tank is designed to be safe, reliable in operation, and sturdy. During operation, strictly adhere to the correct safety regulations and operating procedures.

Precautions for Charging the Oxygen, Nitrogen, and Argon Storage Tank
Pre-charging usually refers to items that have not been used before charging, to ensure the purity of the stored medium. Maintain a positive pressure of 0.03 MPa inside the tank to prevent atmospheric pollutants from being re-absorbed into the water tank.
Pre-charging (Warm Oil Tank) Plan
1. Blow out the storage tank to ensure the purity of the stored medium.
2. Clearly identify the substances included in the transport device that need to be accurately transported.
3. Ensure that all doors are closed except for the liquid level indicator and liquid flow valve. Connect the conveyor transfer hose to the water tank charging joint.Oxygen, Nitrogen, and Argon Storage TankOperational preparation includes adjusting the pressure regulator and opening the pressure regulation circuit. Automatically evaporate the liquid and deliver the gas required for the charging device.
The water tank in use is recharged through the charging valves at the top and bottom. Due to the compression of the steam on the liquid, floor charging will cause the pressure in the water tank to rise. If the correct charging procedure is followed, no faults will occur during use or transportation. Generally, it is not necessary to discharge the pressure in the water tank before charging.
1. Clearly identify that the substances in the conveyor are indeed the substances being transported.
2. Ensure that the charging valves at the top and bottom are closed. Confirm that the tank is at the specified operating pressure.
3. Please ensure that all other doors are in normal operating condition.
5. Connect the conveyor hose to the water tank charging joint.
4. Before charging, open the discharge valve of the charging pipe and convey gas for about 3 minutes, or until the hose starts to frost, cool the water delivery pipeline, and then close the discharge of the charging pipe.
6. Fully open the top charging valve.
Oxygen, nitrogen, and argon storage tank
Related
On July 30, 2026, an inland vessel equipped with Dürr‑customized marine fuel tanks was successfully launched and officially commenced comprehensive sea trials. This new vessel represents another practical milestone in the low‑carbon transformation of inland shipping, while also fully validating Dürr’s superior product quality, end-to-end support services, and efficient project execution and delivery capabilities—setting a high‑standard benchmark for the large‑scale supply of clean‑energy propulsion systems to domestic inland vessels.
2026-07-31
On July 20, Mayor Liu of Nanyang City and his delegation paid a field visit to Nanyang Dürr Gas Equipment Co., Ltd. (Dürr Equipment), conducting an in-depth inspection of the company’s production and operations, technological innovation, industrial-chain development, and workplace safety. Relevant leaders from Sheqi County and the enterprise’s management accompanied the group throughout the visit.
2026-07-21
The fragrant aroma of zongzi leaves heralds the arrival of the Dragon Boat Festival, filling the workplace with warmth and heartfelt care. As this cherished traditional Chinese holiday approaches, Du’er Equipment has meticulously planned and thoughtfully organized a series of initiatives to celebrate and promote China’s rich cultural heritage, extend genuine corporate关怀, and express gratitude for the dedicated efforts of all employees. By strengthening team cohesion and fostering a stronger sense of belonging, Du’er Equipment has extended thoughtful, generous festival benefits and sincere holiday greetings to every employee on duty.
2026-06-18
Recently, Secretary Guan of the Sheqi County Party Committee and his delegation visited the production workshop of Nanyang Duer Gas Equipment Co., Ltd. to conduct an on-site inspection of the company’s operations, technological innovation, and project progress. They listened carefully to the enterprise’s concerns, promptly addressed the challenges and issues it faces, and injected confidence and momentum into its drive for high-quality development.
2026-05-18
Doer's tank container products have been officially shipped overseas
With the continuous growth in global demand for cross-border logistics of cryogenic liquids and industrial gases, the tank container products independently developed and produced by Doer Equipment officially commenced shipment today, bound for overseas markets. Leveraging its excellent pressure-bearing performance, comprehensive auxiliary equipment, and safe and reliable structural design, this product will provide overseas customers with efficient and compliant transportation solutions for cryogenic liquefied gases.
2026-04-06
Duer Equipment Lights Up a New Ecosystem for Inland Waterway Shipping with LNG Fuel Tanks
As the philosophy of “Lucid waters and lush mountains are invaluable assets” takes root in the arteries of industry, green shipping is emerging as the core engine driving high-quality development of inland economic belts. Driven strongly by the nation’s policies on new-energy vessels, the market for inland new-energy ships is entering a golden period of rapid growth. On the Xijiang waterway in Guangxi, vessels equipped with LNG fuel tanks supplied by Nanyang Durr Gas Equipment Co., Ltd. are harnessing clean power to paint an ecological picture of “clear waters flowing smoothly.”
2025-11-27